This is a final estimate checklist, not another product guide. Work through the written scope in order and ask for clarification wherever you cannot connect a line item to the water path or the finished yard.
1. What observed condition is this scope addressing?
The estimate should name the location and symptom without claiming more than the site review established.
2. Where does the water begin?
Confirm the roof, surface, slope, or adjoining area that contributes flow to the problem zone.
3. What is the complete proposed route?
You should be able to trace collection, grading, pipe, swale, or other work from beginning to end.
4. Where is the intended outlet?
Ask why the destination is workable and which address-specific requirements still need confirmation.
5. What will be disturbed and restored?
List lawn, beds, pavement, hardscape, fences, utilities, and access paths touched by the work.
6. Which conditions remain unknown?
Soil, buried material, exact elevations, private lines, and concealed obstructions may need a clear change procedure.
7. What should I observe afterward?
Ask how the route should perform in rain, what needs ordinary maintenance, and when to report an unexpected water path or settlement.